Shuvaddhya Canal Regeneration
Integrated Development Plan for Keraniganj Upazila
Planning Rationale
The project envisions restoring the **Shuvaddhya Canal** as a vital hydrological spine connecting the **Buriganga** and **Dhaleshwari** rivers. This intervention is not merely infrastructural but a holistic urban regeneration strategy to mitigate waterlogging, prevent illegal encroachment, and create a resilient public realm in the rapidly densifying Keraniganj zone.
Ecological Goal
Restore water carrying capacity via sludge removal (13.8km) and advanced treatment (SATP/STP).
Social Goal
Reclaim public land (61.94 acres acquired) for recreational and navigational use.
SDG Alignment
Global Goals Integration
Clean Water
Target 6.3 & 6.6
Sustainable Cities
Target 11.6 & 11.7
Good Health
Target 3.9
Spatial Framework
Contextual Analysis & Alignment
Water Connectivity
Re-establishing the flow between Buriganga and Dhaleshwari rivers to prevent stagnation.
Ecological Zoning
Designated zones for tree plantation and soft landscaping along canal banks.
Land Reclamation
Systematic eviction of illegal structures and compensation protocols.
Blue-Green Infrastructure Strategy
Integrating water management with ecological restoration.
Water Treatment Systems
-
SATP (Solar Aquatic Treatment Plant) Biological treatment using solar energy and aquatic plants.
-
STP & FSM Sewerage Treatment Plant & Fecal Sludge Management.
-
SSDS (5 Nos) Special Sewage Diversion Structures to intercept outfalls.
Environmental Assets
Urban Mobility Network
Connectivity PlanPedestrian Infrastructure
Bridge Network
- Heavy Vehicle Bridges 644 sqm
- Light Vehicle Bridges 365 sqm
- Foot Bridges 749 sqm
Water Transport
- Boat Ghats 1,727 sqm
- Viewing Decks 621 sqm
- Navigation Route Restored
Social Infrastructure
Memorial Plaza
Dedicated civic space for public gatherings and commemoration (110 sqm).
Molla Bari Hat
Renovation and extension of local market hub (1753 Lakh BDT allocated).
Public Amenities
6 Public Toilets, 552 Dustbins, Seating Benches, and Watch Towers.
Capital Investment Distribution
Allocation of funds across major planning sectors (Lakh BDT)
Fiscal Phasing
Focus: Land Acquisition & Excavation
Focus: Structural Construction
Focus: Finishing & Handover
Planning Toolkit & Techniques
Methodologies applied to achieve urban regeneration.
Blue-Green Integration
Combining hydrological restoration (canal dredging) with ecological corridors (tree plantation, eco-islands) to manage stormwater and enhance biodiversity.
Multi-Modal Connectivity
Designing an integrated transport network prioritizing NMT (Non-Motorized Transport) via 22km walkways and restoring inland water transport routes.
Strategic Land Assembly
Executing complex land acquisition (61.94 acres) to reclaim public right-of-way and establish civic zones in a high-density peri-urban fabric.
Placemaking & Civic Design
Creating active public realms (Plazas, Ghats, Hats) to foster social interaction and cultural heritage preservation (Molla Bari Hat renovation).
Environmental Management
Implementing advanced waste diversion (SSDS) and treatment protocols (EMP) to mitigate pollution and improve urban micro-climates.
Capital Improvement Planning
Structuring a multi-year phased investment strategy (Fiscal Phasing) to ensure sustainable funding flow and project deliverability.