Shuvaddhya Urban Regeneration Framework

Shuvaddhya Canal Regeneration

Integrated Development Plan for Keraniganj Upazila

100% GOB

Planning Rationale

The project envisions restoring the **Shuvaddhya Canal** as a vital hydrological spine connecting the **Buriganga** and **Dhaleshwari** rivers. This intervention is not merely infrastructural but a holistic urban regeneration strategy to mitigate waterlogging, prevent illegal encroachment, and create a resilient public realm in the rapidly densifying Keraniganj zone.

Ecological Goal

Restore water carrying capacity via sludge removal (13.8km) and advanced treatment (SATP/STP).

Social Goal

Reclaim public land (61.94 acres acquired) for recreational and navigational use.

SDG Alignment

Global Goals Integration

6

Clean Water

Target 6.3 & 6.6

11

Sustainable Cities

Target 11.6 & 11.7

3

Good Health

Target 3.9

Project Area
13.88 km
Canal Length
Land Acquisition
61.94 Acres
Critical Path
Public Space
22.58 km
Walkways
Total Investment
1,175 Cr BDT
FY 2018-2021

Spatial Framework

Contextual Analysis & Alignment

GIS Data

Water Connectivity

Re-establishing the flow between Buriganga and Dhaleshwari rivers to prevent stagnation.

Ecological Zoning

Designated zones for tree plantation and soft landscaping along canal banks.

Land Reclamation

Systematic eviction of illegal structures and compensation protocols.

Blue-Green Infrastructure Strategy

Integrating water management with ecological restoration.

Water Treatment Systems

  • SATP (Solar Aquatic Treatment Plant) Biological treatment using solar energy and aquatic plants.
  • STP & FSM Sewerage Treatment Plant & Fecal Sludge Management.
  • SSDS (5 Nos) Special Sewage Diversion Structures to intercept outfalls.

Environmental Assets

2,600
Trees Planted
1
Eco Island
13,969
Lakh BDT for Water Quality

Urban Mobility Network

Connectivity Plan

Pedestrian Infrastructure

9.72 km
Floating Walkways
12.86 km
Surface Walkways

Bridge Network

  • Heavy Vehicle Bridges 644 sqm
  • Light Vehicle Bridges 365 sqm
  • Foot Bridges 749 sqm

Water Transport

  • Boat Ghats 1,727 sqm
  • Viewing Decks 621 sqm
  • Navigation Route Restored

Social Infrastructure

Memorial Plaza

Dedicated civic space for public gatherings and commemoration (110 sqm).

Molla Bari Hat

Renovation and extension of local market hub (1753 Lakh BDT allocated).

Public Amenities

6 Public Toilets, 552 Dustbins, Seating Benches, and Watch Towers.

Capital Investment Distribution

Allocation of funds across major planning sectors (Lakh BDT)

Fiscal Phasing

Phase 1 (2018-19) 56,584.67

Focus: Land Acquisition & Excavation

Phase 2 (2019-20) 41,638.44

Focus: Structural Construction

Phase 3 (2020-21) 19,330.32

Focus: Finishing & Handover

Planning Toolkit & Techniques

Methodologies applied to achieve urban regeneration.

Blue-Green Integration

Combining hydrological restoration (canal dredging) with ecological corridors (tree plantation, eco-islands) to manage stormwater and enhance biodiversity.

BGI SATP

Multi-Modal Connectivity

Designing an integrated transport network prioritizing NMT (Non-Motorized Transport) via 22km walkways and restoring inland water transport routes.

TOD NMT

Strategic Land Assembly

Executing complex land acquisition (61.94 acres) to reclaim public right-of-way and establish civic zones in a high-density peri-urban fabric.

Zoning Acquisition

Placemaking & Civic Design

Creating active public realms (Plazas, Ghats, Hats) to foster social interaction and cultural heritage preservation (Molla Bari Hat renovation).

Urban Design

Environmental Management

Implementing advanced waste diversion (SSDS) and treatment protocols (EMP) to mitigate pollution and improve urban micro-climates.

EIA EMP

Capital Improvement Planning

Structuring a multi-year phased investment strategy (Fiscal Phasing) to ensure sustainable funding flow and project deliverability.

CIP Finance
Scroll to Top